Spring 2013
Important
Dates:
Test 1: March 18 – 21 (48
hr time frame)
Open Book,
Notes, Powerpoints
All Tests Due
by 4 p.m. on Thursday, March 21st
Test 2: April 26 - May 1 (48 hr time frame)
Open Book, Notes, Powerpoints
All Tests Due by 4 p.m. on
Wednesday, May 1st
Class Notes:
Part 1:
Readings for Geotechnology:
Part 2:
Pavement Design and CBR Procedures
Paper
Washington Post: “Beneath the surface,
the Beltway crumbles…”
Landslides
in Seattle, Washington
Labs and
Homework
Engineering
Classification of Soils
Due
Date: Wednesday, February 6 at end of class
Mohrs
Circles
Proctor Test
Laboratory Instructions
Due Date: Friday, March 1 at beginning of
class
Due Date: Monday, April 1 at beginning of
class
An example report of the Direct
Shear Test
Helpful Tips
Guide
to taking strong field notes